Three plunger high pressure reciprocating pump safety rules are there

We know that machinery and equipment will have some safety rules or regulations, these people pay attention to it? Here, Xiao Bian to say that three plunger high pressure reciprocating pump safe operation rules which remind everyone in the operation of three plunger high pressure reciprocating pump, what should pay attention to, what to do. The following introduction is divided into pre-job and homework, a little more content, I hope everyone to learn Oh. Three plunger high pressure reciprocating pump safety pre-operation What are the pre-operation: 1, the pump should be placed at a solid location, the installation should be solid, stable, and rain-proof measures, parallel installation of several pumps should be 0.8-1M spacing. 2, the new pump or disable the pump for a long time before the start of the first inspection of the various parts, wash the anti-rust oil, check the crosshead, connecting rod, crankshaft and other rust and scratches, the various parts of the threaded connection is loose. 3, pay attention to the pump input direction of rotation should be consistent with the direction signs, otherwise there is the danger of damage to the crosshead. 4, the installation should check the motor and pump connection is concentric, the coupling bolts are solid, exposed rotating parts should have protective devices. 5, three plunger high pressure reciprocating pump check before entering the stent is solid, whether the suction pipe is blocked or leaking, the filter is good. 6, the provisions of the oil into the crankcase, and check the oil level. Work: 1, the new pump or pump parking longer, before the start of the coupling should be in the car, check the various parts of the movement is flexible. 2, the pressure of the three plunger high pressure reciprocating pump open. 3, open the suction section or the output section of the valve. 4, check the suction section or the output connector is tightened, so as to avoid three-piston high pressure reciprocating pump inhaled air. 5, start the motor. 6, let the water spout from the opening, discharge the air from the pump head. 7, the normal operation of the pump load can be pressurized under pressure, the pressurization process to be carried out slowly, the process of boosting should be aware of whether there is any abnormal sound and vibration. 8, the load operation should check whether the crankcase and other parts of the heat, the temperature should be stopped to check the pump too high. 9, short stoppage can stop pump, if long time interval to stop the motor, after starting just check the oil level, open the suction valve, open the high pressure side of the control mechanism can be. 10, leakage, leakage or fever immediately stop packing parts overhaul. Each operator should keep in mind the safe operation of the three-piston high pressure reciprocating pump, which is not only responsible for the work, but also a protection of their own safety. Although more than a safe operation of the rules, but the operator can not save trouble, the only way to be safe, work and efficient. Expand to read: Pumps Valves Tube fittings Exhibition Water Expo Xiamen Maritime Exhibition Internet + Forum Yiwu Fair Mold Top Ten Brands 2016 Exhibition Information This article belongs to Industrial Internet (Xiamen) Technology Co., Ltd. All are welcome to reprint, please note Ming author and source of: Asian pumps network editor: small L (QQ / micro-channel:) starting: http: //beng.liuti.cn/ (service hotline:)

Water treatment agent

cation exchange resin, anion exchange resin, The Preparation of Pure Water

YIBIN PERFEC INTERNATIONAL TRADE CO.,LTD , https://www.yibinbofei.com

Posted on