Precautions for the replacement of the second floor tile into the wooden floor

First, before the construction, the ground level should be leveled first. If the cement mortar is used for leveling, the moisture content of the base layer is not more than 15%. The ground keel can be installed first to prevent the leveling effect from affecting the floor installation.

2. After the floor is transported to the construction and installation site, it should be unpacked and stored indoors for more than one week to make the wooden floor and the room temperature and humidity suitable for use.

Third, construction should be avoided under climatic conditions such as rain and rain. It is best to keep the indoor temperature and humidity stable during construction.

Fourth, the wooden floor of the same room should be paved once, and the finished product should be protected in time to prevent oily, fruit juice and other contaminated surfaces. The glue that is squeezed out during installation should be wiped off in time.

Fifth, to prevent thermal expansion and contraction, if it is a composite floor, it is best to leave a gap of 1.2cm around, if it is a solid wood floor to leave 1cm gap.

Kitchen Faucet

A kitchen faucet is one of the most frequently used devices in your home. Our modern kitchen faucets offer an exciting mix of innovation, style and functionality to meet the demands of every household. We offer many types of kitchen sink faucets to choose from, including pull-down kitchen faucets, pull-out kitchen faucets, one, three hole faucets, faucets with multi-layer brushed nickel finishes and PVD finish ect .

Kitchen Faucet,Sink Tap,Touchless Kitchen Faucet,Pull Down Kitchen Faucet

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.meiaogroup.com

Posted on