Home decoration design material selection 50 Notes

Home decoration design material selection 50 Notes

1, do not do the head of the shoe partition, leave a little space so that the gray shoes can leak to the bottom, installed above the sink and gas stove lights. When determining the location of a bathroom floor drain, you must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point regardless of how the brick is inclined.

2, bathroom, air conditioning socket are not designed switch. Especially bathroom electric water heater, with a double switch with a plug is appropriate.

3, on the face of the brick corner of the treatment method, in the final analysis is to see the level of workers. If the masonry workers are in good condition and the tools for grinding tiles are good, they should not hesitate to grind the 45-degree angle. From the effect point of view, as long as the grinding is good, the practice of grinding the angle of 45 degrees is the most beautiful! If the level of the worker is really not good, then you still choose to use the angle strip, because the poor 45-degree angle grinding method is not as good as the effect of the negative angle strip.

4. It is also very important to test the water pressure after the water pipes are arranged. When testing, everyone must be present, and the test time is at least 30 minutes, preferably one hour. Ten kilograms of pressurization, and finally there is no reduction to pass the test.

5, plastic steel doors must be considered when the size of the plastic steel door frame protruding wall, informed the installation staff, making the final door frame and finished tile wall is flat, so both beautiful and good hygiene.

6, the carpentry door package and the mason's tiling is also to match, when the package door, we must consider the following ground (door on both sides of the ground on either side) whether it is still tile or other cement mortar leveling thing, Because the door covers are nailed to the floor if they are nailed before applying the tiles, if the cement and the door cover are stained when cement is used in the future, it will cause the door cover to be watery and moldy.

7, the mattress and the bed board must be breathable. Bed board is generally best with fir board

8, do paint as much as possible with paper tape

9, buy luminaires should pay attention: generally try to use glass, stainless steel, copper or wood (shelf), generally do not buy what plating on the top of what other plating ah, what paint ah and the like, easy to fade.

10, basins try to use ceramic basins, glass basins are difficult to engage in health

11, hydropower reform to their own plans, asking them to open the line according to Cao. I watched them draw lines, and pressed the line to draw Cao. Each item must be checked and accepted.

12, waterproof must be done, we must test the water!

13. Many verbally-constructed agreements have become slaughtered at the time of checkout. They must be written in black and white. Any increase or decrease in the number of items must be clearly stated. Write out!

14. If the ground is installed on the ground, the ground must be re-doed to re-level the cement layer.

15, the kitchen door, or to decorate the carpenter to do wooden hanging rails as well.

16, the living room as much as possible to install the power plug.

17, outside the bathroom shower or partition. You can't figure out how to pull a shower curtain, the actual flow of water over the floor.

18, to do the material of the door and door frame to choose the fine materials of wood.

19, before installing the cabinet must confirm that your home waterway is OK.

20, kitchen and floor tiles must not pick white.

21, the ceiling should pay special attention to wipe the putty before wiping Dulux

22, the number of living room lighting should not be too much, simple as well, otherwise like a lighting shop! ! !

23, buy those things that need to install as much as possible to require the installation of sales, it does not include the installation, we must insist on the completion of the installation before paying the full amount! !

24. During the renovation, bring the business card of the manufacturer that you collected before

25, the protective film of the aluminum buckle plate is best removed before loading.

26, shoe cabinets are best to use shutter doors, deodorant. You can leave a socket on the side of the shoe cabinet to insert and bake shoes.

27, the place where you can cut vegetables can be a small lamp.

28. If it is convenient, the restaurant can also arrange air fans so that when eating hot pots or making barbecues, the ceiling of the hall will not be contaminated.

29, the best arrangements for the entrance of a cabinet to put debris, can be placed on the top of the shoe. It is very convenient to put commonly used things such as umbrellas, bags, scissors, change, drugs, and so on.

30, if you must use aluminum buckle ceilings, it is recommended 1, not too expensive, 2, the use of net color, especially the kitchen ceiling, pure white is very good, and the color white and unless the decoration style match, otherwise it is easy Do not coordinate, 3, grasp their own ideas, do not believe the eyes of selling smallpox, their vision is really soil. 4, stare at the scene, close the edge is very important, do not let them sloppy, or leave a black seam, how to see how ugly.

31. The third day is mainly to drill holes and continue to put tiles. The exhaust holes of the range hoods and water heaters should be pre-punched. If they are well-sealed, then it will be inconvenient. Therefore, be sure to choose a range hood, stoves and water heaters before the renovation to determine the size of the hole.

32. Considering that the customized cabinets are good-looking, but not durable, after integrating the opinions and experiences of some students on the Internet, the cabinets are made of cement, with ceramic tiles on both inside and outside surfaces, marbles on the countertops, and cabinets and doors. Wood to do it. The cabinets thus made are durable and moisture proof.

33. After the door covers are made, the plasterer begins to install the plaster lines and the wall ash project. The walls of my home were relatively flat, and 2-3 lanes would be sufficient. When the batch of ash is approved once a batch of ash, then brush the primer, brush after polishing, and finally with ICI brush finish two times, the entire wall looks smooth and smooth, really good. After the wall ceiling project was completed, the woodworking masters began to make wardrobes. The closet is made of 18cm Weiye brand big core board, and then the outer panel is decorated, although there is no furniture store to buy so beautiful, but durable, the quality should be better than to buy. I am not afraid to stand on the cabinet's board.

34, other students must pay attention to the following points in the tiling: 1 best you can in the scene 3 wall tiles, tiles before posting, soaking time must be enough. 4 Be sure to plug the ground drain and prevent it from plugging. My family's floor drain was blocked because of the loss of cement. It took 30 to find the management office to clear and get a lot of small mud blocks. 5 people at the scene, workers will not waste tiles. My family was not at the scene when I was tiling, but later I went to see and wasted a lot of bricks.

35. The length and height of a wall. If a bathroom has four walls, each wall must measure its length and height. Then deduct one more window and door area. Finally calculate the area of ​​the ground. After you have sized it, you can also get a shop selling tiles, and they will help you meet again. Add 5% loss.

36, the bedroom's top light is best double-controlled, one by the door, a bedside.

37, the location of the socket must be considered good, height, interval. Even when I first hit the location of the cassette, I encountered a steel bar. After the box was placed, I found that it was just blocked by the TV cabinet, microwave oven, and desk. I had to move the first two furniture positions high and found that it was not only highly ergonomic, but also it could not be bought. Good stainless steel cabinet feet can only be customized aluminum feet.

38. It is only necessary to install one at a corner of the aisle, that is, bright and effective.

39. When the lamp was installed, the position of the table was not taken into account. Now the lamp is not in the middle of the table.

40, bathroom tiles do not use too prime, one is easy to dirty, and second, a long time too plain!

41, outlets should be more equipment, furniture to buy outside, the ground to be dirty and safe to consider, like to see more, the principle should be adhered to

42, aluminum buckle board does not have to buy high prices, very cheap aluminum buckle board has far better than the effect of PVC, and then spend more money and can not see significantly different results. Buy aluminum buckle board should pay particular attention to the keel instead of the aluminum buckle board itself (the target of the aluminum buckle board is not easy to make hands and feet), the keel often play with ghosts.

43, the color of the floor tiles is difficult to find satisfactory, I did not find, but two kinds of unsatisfactory color intertwined and then turn a 45-degree angle can reach my very satisfied results. This good idea was actually suggested by the bricklayer.

44, when the cabinet on the top of the balcony, then the back of the cabinet with a layer of foam plastic insulation and waterproof effect is very good. Balcony doors are best not to use the same type of fire board. The balcony environment is rather harsh.

45, if not suitable wood lines may be customized, customized quality seems to be better than the sample.

46. ​​The stainless steel feet used in bathroom cabinets are profiteering. To find some of the store's back, the price is cheap.

47, install the lock should pay attention to the lock tongue on some wax, crashed and then on the wax later. If there is no door stopper, be careful to prevent the handle from damaging the wall.

49, matt paint is more beautiful than high light

50. If the decoration will use finished putty instead of talcum powder.

Tile entrance decoration cement paint socket stainless steel door price living room wall color living room lamp kitchen door decoration living room decoration partition decoration style marble dining table home cabinet floor tile door white furniture glass table glass dining table kitchen glass sliding door cabinet door partition door partition cabinet marble cabinet Kitchen Wall Tiles Glass Doors Glass Tiles Cabinet Doors Marble Tiles Glass Cabinets Cabinets Shutters Doors Glass Furniture Stainless Steel Cabinets Glass Doors Kitchen Cabinets Doors Cabinets Bathrooms Tiles Bathroom Doors Bathroom Tiles Colors Bathroom Wall Tiles Bathroom Doors Size Toilet partitions Bathrooms Bathrooms Toilets Waterproof Prices Bathroom exhaust fan bathroom design bathroom waterproof bathroom floor tiles bedroom lamps

One Color LED Panel Light

One Color Led Panel Light,Hexagon Light Panels,Flat Panel Led Lights,Surface Panel Light

Jiangmen hengshenghui Lighting Co., Ltd , https://www.jmsunbright.com

Posted on