What are the processes for simple decoration? Simple decoration steps and precautions

I just bought a rough house for some of the "small whites", do you feel a headache? This is not a problem. Ha ~ today's decoration home network Xiaobian to introduce you to the simple decoration steps of the rough room, follow me to find out!


简单装修步骤


The roughest decoration step process method/step

First, check the direction of the water pipes inside the house. Follow the direction to check carefully whether there is any possibility of water seepage. Be sure to kill this in the cradle and see if anyone complains downstairs. This is very important. If there is a problem, immediately find the property or a professional to correct it in time.


Second, the basic project is carried out according to the designed design. For example, removing walls, windows, stairs, etc. Pay attention to the construction time, after 8 o'clock in the day, before 5 o'clock in the afternoon, do not affect the rest of the neighbors.


Third, then carry out the transformation of the ground to make the spatial pattern more harmonious and perfect. It is best to finish after 8 o'clock in the day and before 5 o'clock in the afternoon. Do not affect the rest of the neighbors.


Fourth, the next step is hydropower transformation, planning the location and number of jacks that need to be placed in each room. Because this is hidden inside the wall, we must remember to plan before starting work.


Fifth, the life socket must be more than a few, preferably a few more than planned. But don't be too much, strong power and weakness should be kept at a distance of 20 cm. Renovate and plan the location and number of jacks that need to be placed in each room. Because this is hidden inside the wall, remember to plan well before starting work.


Sixth, waterproof packaging, mainly for the ground, wall, bathroom, kitchen, water pipes to go through the path to be waterproof.


Seventh, the next step is to lay the floor tiles and tiles. When laying floor tiles and tiles, be careful not to bulge or have voids. Stick wallpaper, install windows and doors, etc.


Eighth, began to paint the wall, pay attention to record the direction of the water and the direction of electricity. In case of future needs. Remember to wear a mask when painting.


Ninth, the next step is to install the kitchen stove, the bathroom heater wall inside the wardrobe closet on the balcony and so on.


Tenth, after cleaning up the sanitation. It is ok to move the furniture of the big bag into the new home.


简单装修步骤注意事项


The most simple decoration steps in the rough room

1. Plan well before renovation

2, before the renovation to do a good job design

3. Tell the neighbors before starting work.

4, pay attention to the time of construction does not affect the neighbors rest

5, paint the wall should pay attention to wearing a mask


The above is the whole content of the simple decoration steps brought by Xiaobian. I believe that after reading this article, everyone has a basic understanding of the simple decoration steps. If you want to know more about decoration consultation, please click to enter the decoration. Process section.


More related wonderful reading:

Familiar with simple decoration steps to become a renovation person


This device is a fully automatic Mask Machine( outside ear-loop). It can be used for the production of flat medical masks, flat protective masks and masks with the maximum of 3 layers. We adopt ultrasonic welding technology, and the finished product is beautiful. The whole production line from feeding, nose line insertion, edge sealing, cutting to finished products are fully automated. This machine are operated easily, and it can save a lot of labor cost. This machine has mature and stable technology with low failure rate. This equipment adopts photoelectric detection so it can sensing the raw materials to avoid mistakes and reduce waste.


Product parameters and technical features:

1. Ultrasonic fusion technology is adopted, and only need one person to operate

2. .The whole machine is operated automatically from feeding, nose line insertion, edge sealing and cutting.

3. The frame structure is made of aluminum alloy, which is non-rusting, durable, easy to clean and beautiful.

4. Adopted PLC control system and choose international brand for pneumatic components.

Medical Mask Machine

Medical Mask Machine,Automatic Face Mask Machine,Surgical Mask Making Machine,Medical Face Mask Making Machine

Dongguan Huitong Automatic Machinery Technology Co., Ltd , https://www.medicalmaskmachines.com

Posted on