Urban Conservation Center holds emergency rescue drills

News Related Keywords: No tags.

It is reported that this year, the Party Committee’s political office requires all conservation units to be ideologically aware of the flood prevention work and attach great importance to it; flood control responsibility is in place and people reach facilities; flood prevention work is in place and timely completion of the pre-plumbing disease rehabilitation work. Strengthen inspections, repair water damage facilities in time after rain, prepare for flood prevention teams and emergency equipment in advance, and meet road emergencies to achieve rapid response and efficient disposal. The contents of this drill include emergency procedures for emergency response, pre-disposal at the scene of emergency rescue, traffic maintenance, coordination of rescue teams, on-site analysis and disposal, and information reporting. Through meticulous organization and careful arrangements, with the strong support of the traffic control department, emergency rescue drills for road collapse during the flood season have achieved the desired results. In the process, the emergency rescue teams have been dispatched at any time, quickly arrived, fully equipped, equipped with skilled and efficient operations, and the drill procedures are scientific and reasonable, and the links are clear. This has accumulated valuable experience for the handling of emergency rescue accidents during the flood season this year. According to statistics, a total of 25 emergency rescuers, 8 rescue vehicles, and 6 emergency rescue equipments were deployed in the drill.

In view of the fact that the passageway in previous years is prone to water accumulation and pedestrians are affected, in the next step, the city maintenance center will organize drainage channels for drainage disposal drills to ensure that in this year's flood prevention work, the situation of channel water accumulation can be quickly responded and eliminated. Create good conditions for people to travel. Foreword: The Beijing Urban Road Maintenance Management Center recently organized the mobilization and deployment meeting for flood prevention work in 2012 to listen to the establishment of the flood control responsibility system and preparations for flood control prevention in this year's conservation units, including the completion of the centralized repair of the floodgates, and the cleanliness of the trenches and culverts. Situation, maintenance of bridge drainage system, inspection of access pump room and water pump, cleanup of rainwater outlets and branch pipes in the channel, and preparation of emergency flood control equipment.

In order to ensure the emergency protection of urban roads and bridges and facilities in cities, to deal with possible extreme weather conditions in the flood season, and to ensure the smooth flow of roads and bridges, the city center organized related units to carry out emergency rescue drills during the flood collapse period after convening a mobilization and deployment meeting for flood prevention work. , to accumulate experience for the handling of emergency rescue accidents in the flood season.

Electroplating Materials

Electroplating Materials,Nickel Sulfate,Nickel Sulfate Green Crystal,Cas No.7786-81-4

Jinan huijinchuan trading co. LTD , https://www.hjcchemical.com

Posted on