The main considerations for the whole bathroom installation have to be said

Overall bathroom installation precautions

1. First of all, it is necessary to know that the pre-buried hole position of the overall bathroom size should be designed before the bathroom is not renovated, so as to avoid too much trouble in subsequent installation.

2. If you have installed the best custom shower room for the water supply system and tiles, you will need to rework, so the loss is too great.

3. For safety reasons, the wiring leakage protection switch device should be considered before installation in the shower room to avoid rework.

4, the style of the shower room depends on the layout of the bathroom, common corner type and one-line type.

5, the overall bathroom shower room must be firmly connected to the building structure, can not shake.

6. The appearance of the whole bathroom after installation should be neat and bright. The sliding door and the sliding door are parallel or perpendicular to each other. The left and right symmetry and sliding door should be opened and closed smoothly, without gaps and water seepage. The shower room and the bottom basin are sealed with silicone.

High temperatures caster series , as a professional chinese caster manufacturer ,with rich R&D experience , which enable us to customize according to client's request ,  Size of thread stem , wheel material , type of brake , just let me know what you want , Rich Industrial Caster series , various from rigid wheel caster , Swivel Caster and Brake Caster , full size series make us become one-stop caster services center for you .

High Temperature Casters

High Temperature Casters,High Temperature Phenolic Caster,High Temperature Rigid Casters,High Temperature Trolley Caster

Zhejiang Lingda Caster Co., Ltd , https://www.ldcaster.com

Posted on